§ 70-96.14. Site Plan approval.  


Latest version.
  • Prior to the issuance of a building permit for a building or structure pursuant to this article, a site plan shall be submitted to and approved by the Town Board in accordance with the requirements set forth in § 70-219, if any one or more of the following criteria are met:
    A. 
    The construction of a new building or addition to an existing building of greater than 2,000 square feet of gross floor area.
    B. 
    The construction of a new building or freestanding structure of addition to an existing freestanding structure greater than 20 feet in height.
    C. 
    The change in use of an existing building or buildings on a site in a manner which will increase the number of required off-street parking spaces for the site pursuant to § 70-96.11 by more than 5%.
    D. 
    A change in the number or location of access/egress points, curb cuts or entrance/exit drives.
    E. 
    Two or more projects within a twenty-four month period which cumulatively add more than 3,000 square feet of gross floor area or which cumulatively meet the criteria of § 70-96.14.3.
    F. 
    Any project in which it is determined by both the Commissioners of Buildings and Planning that the project will have potentially significant impacts which warrant Town Board review.
Amended 10-16-2007 by L.L. No. 9-2007