§ 70-96.14. Site Plan approval.
Latest version.
-
Prior to the issuance of a building permit for a building or structure pursuant to this article, a site plan shall be submitted to and approved by the Town Board in accordance with the requirements set forth in § 70-219, if any one or more of the following criteria are met:A.The construction of a new building or addition to an existing building of greater than 2,000 square feet of gross floor area.B.The construction of a new building or freestanding structure of addition to an existing freestanding structure greater than 20 feet in height.C.The change in use of an existing building or buildings on a site in a manner which will increase the number of required off-street parking spaces for the site pursuant to § 70-96.11 by more than 5%.D.A change in the number or location of access/egress points, curb cuts or entrance/exit drives.E.Two or more projects within a twenty-four month period which cumulatively add more than 3,000 square feet of gross floor area or which cumulatively meet the criteria of § 70-96.14.3.F.Any project in which it is determined by both the Commissioners of Buildings and Planning that the project will have potentially significant impacts which warrant Town Board review.
Amended 10-16-2007 by L.L. No. 9-2007